CSG Continues Work on the University of Georgia Veterinary Learning Center

CSG prepared the schematic design estimate on this approximately 230,000 SF new facility at the University.  CSG worked directly for the architect on this CM at risk project, performing multiple estimates, breakout cost studies, and CM reconciliation. The facility was designed with approximately 230,000 square feet of enclosed and covered space including separate barn spaces. The site was designed with a storm water retention system, large fenced pastures, pervious paving, and diverse landscaping. The Main Building included a lower level,...

read more

CSG Estimating Responsibilities on the Atlanta Beltline Project Continue to Expand

CSG completed a Budget Estimate for the Atlanta Beltline Project from Monroe Dr to DeKalb Ave in mid 2010.  In late 2010 CSG provided Cost Management for the Construction Documents phase of the same stretch of the new Beltline Project. CSG’s estimating responsibilities for the Beltline Project have been expanded to stretch from Monroe Dr to Glenwood Ave.  CSG has recently completed the Schematic Design Estimate for this section of the Atlanta Beltline Project named the “Eastside Corridor.”  CSG will continue providing Cost...

read more

CSG Provides Cost Management For the Georgia State Law School

After the successful completion of the Construction Cost Estimate for the Conceptual Phase of the project in August 2011, CSG will continue to prepare phased Cost Estimates during the remainder of the design phases. Brief Project Description: The design includes a concrete structure, terra cotta rainscreen and stone veneer exterior wall finishes, and expanses of curtain wall.  Interior spaces include courtrooms, law library, dean’s suite, tiered lecture halls and traditional classrooms.  The estimated construction cost of this 200,000 SF...

read more

Costing Services Group, Inc. | Accurate Construction Cost Estimating | Cost Estimating | Cost Management | Value Engineering | Value Management | Budget Verification | Scheduling

COSTING SERVICES GROUP, INC. (CSG) has been in business since 1979 providing services that range from single phase building cost estimates to full Construction Document Estimates and VE evaluations.  CSG has successfully participated in over 3,500 projects for more than 250 clients in 50 states, the Caribbean, Europe, Africa and Asia.   COSTING SERVICES GROUP, INC. is a privately owned corporation.  CSG qualifies as a small business and has been certified as a 100% Woman Owned Business Enterprise (WBE) and a Disadvantaged Business...